Skip to content
Workspace / VPP OperationsSIMULATION MODE
SIMULATION CLOCK · PAUSEDInterval 0 / 96 · time-only playback · 15 minutes per step
Playback: every 2 seconds, no dispatch. Reset clears edits and history.

DRIVEGRID / DISTRIBUTED ENERGY RESOURCES

Distributed Energy Asset Fleet

Inspect, understand and configure your simulated energy portfolio.

FLEET MANAGEMENTSIMULATED ASSETS · NO LIVE DEVICES
SIMULATED ASSETS Changes affect this browser session only. No device commands are sent.
Registered assets1,150
Rated power20 MW
Available dispatch12 MW
Energy capacity117.7 MWh
01 / DISTRIBUTED PORTFOLIO

One fleet. Three energy resources.

Current simulated portfolio · all registered assets

01

EV / V2G

Bidirectional mobility

Electric cars at bidirectional charging stations
REGISTERED ASSETS1,000
DISCHARGE-AVAILABLE900 assets
Rated power
7 MW
Energy capacity
75 MWh
Weighted battery SOC
68%

Energy-capacity weighted · current snapshot

02

RESIDENTIAL BESS

Energy at home

Solar homes with residential batteries
REGISTERED ASSETS100
DISCHARGE-AVAILABLE80 assets
Rated power
1 MW
Energy capacity
2.7 MWh
Weighted battery SOC
68%

Energy-capacity weighted · current snapshot

03

COMMERCIAL BESS

Commercial flexibility

Commercial battery storage containers
REGISTERED ASSETS50
DISCHARGE-AVAILABLE40 assets
Rated power
12 MW
Energy capacity
40 MWh
Weighted battery SOC
68%

Energy-capacity weighted · current snapshot

FLEET COMPOSITION

Rated power by resource

Segment widths represent rated MW, not asset counts.

  • EV / V2G7 MW
  • Residential battery1 MW
  • Commercial BESS12 MW

Asset registry

Select an asset to inspect ratings, SOC limits, and operational settings.

1,150 matching assets · Individual equipment units shown in each cell
Asset / locationStatusAvailabilityRated powerAvailable powerEnergy capacitySOCDetails
EV / V2G 0001ev-v2g-0001 · Dallas
readyavailable7 kW6 kW75 kWh
68%
EV / V2G 0002ev-v2g-0002 · Houston
readyavailable7 kW6 kW75 kWh
68%
EV / V2G 0003ev-v2g-0003 · Austin
readyavailable7 kW6 kW75 kWh
68%
EV / V2G 0004ev-v2g-0004 · San Antonio
readyavailable7 kW6 kW75 kWh
68%
EV / V2G 0005ev-v2g-0005 · Dallas
readyavailable7 kW6 kW75 kWh
68%
EV / V2G 0006ev-v2g-0006 · Houston
readyavailable7 kW6 kW75 kWh
68%
EV / V2G 0007ev-v2g-0007 · Austin
readyavailable7 kW6 kW75 kWh
68%
EV / V2G 0008ev-v2g-0008 · San Antonio
readyavailable7 kW6 kW75 kWh
68%
EV / V2G 0009ev-v2g-0009 · Dallas
readyavailable7 kW6 kW75 kWh
68%
EV / V2G 0010ev-v2g-0010 · Houston
readyavailable7 kW6 kW75 kWh
68%
EV / V2G 0011ev-v2g-0011 · Austin
readyavailable7 kW6 kW75 kWh
68%
EV / V2G 0012ev-v2g-0012 · San Antonio
readyavailable7 kW6 kW75 kWh
68%
EV / V2G 0013ev-v2g-0013 · Dallas
readyavailable7 kW6 kW75 kWh
68%
EV / V2G 0014ev-v2g-0014 · Houston
readyavailable7 kW6 kW75 kWh
68%
EV / V2G 0015ev-v2g-0015 · Austin
readyavailable7 kW6 kW75 kWh
68%
EV / V2G 0016ev-v2g-0016 · San Antonio
readyavailable7 kW6 kW75 kWh
68%
EV / V2G 0017ev-v2g-0017 · Dallas
readyavailable7 kW6 kW75 kWh
68%
EV / V2G 0018ev-v2g-0018 · Houston
readyavailable7 kW6 kW75 kWh
68%
EV / V2G 0019ev-v2g-0019 · Austin
readyavailable7 kW6 kW75 kWh
68%
EV / V2G 0020ev-v2g-0020 · San Antonio
readyavailable7 kW6 kW75 kWh
68%
Page 1 of 58

SELECTED ASSET

EV / V2G 0001

ev-v2g-0001 · Dallas

SIMULATED
Electric cars at bidirectional charging stations
CURRENT ASSET SNAPSHOT
readyavailable

Battery state of charge

68%
Existing stored SOC · changes apply only after saving
Rated power
7 kW
Available dispatch
6 kW
Energy capacity
75 kWh
Max charging power
7 kW
Max discharging power
6 kW
SOC limits
20–100%
V2G enabled
Yes

Dispatch requires available + ready status, SOC above the minimum, and V2G enabled for EVs. Available power is sustainable for 15 minutes at 95% discharge efficiency. Manual dispatch changes SOC; clock playback alone does not.